Custom Bags for Kickstarterby QUANZHOU JUNYUAN BAGS Get a quote

Custom Tote Bag MOQ: What 500-Piece Minimums Mean

A 500-piece minimum on a custom tote bag is not an arbitrary number. It is the point at which fabric can be bought in a single dye lot, trim and print setups stop dominating the unit cost, and a sewing line can run long enough to reach steady output. The minimum applies per style and per colourway, which is the part that catches creators out: two colourways at 500 each is not a 1,000-piece order. This guide explains what drives the number, how it is counted, what happens below it, and the strategies that let a small campaign work inside it without over-ordering.

A tote bag from the pilot run — Custom Tote Bag MOQ
A finished tote bag from a 500-piece run, the unit the pricing below is quoted against.
500 pcsMOQ per style / colourway
6-10 daysSampling per round
35-50 daysBulk production window
10-25%Typical FOB drop, 500 to 2,000

What the 500-piece minimum actually means

The minimum is 500 pcs per style and per colourway, and every word in that sentence carries weight. Five hundred is the quantity floor. Per style means each distinct design, including size variants of the same design, is its own minimum. Per colourway means each fabric colour is its own minimum even when the design is identical. A campaign ordering a tote in black and in natural at 250 each has placed two orders below the minimum, not one order at 500, and it will be priced and scheduled accordingly.

Understanding that structure is the difference between a quotation that matches the budget and one that does not. The most common surprise on a first campaign is a creator who expects a combined quantity discount and discovers that their 1,000-unit campaign is being quoted as two 500-unit runs. The fix is usually simple: consolidate to one colourway at the full quantity, or choose colourways that each genuinely clear 500. Both are design decisions, and both are far cheaper to make before sampling than after.

  • 500 pcs is the quantity floor per style and per colourway, not per campaign.
  • A size variant of the same design is usually its own style for minimum purposes.
  • Each fabric colour is its own minimum, even with identical artwork and construction.
  • Print colourways on the same fabric colour often do not carry a new fabric minimum, so ask specifically.
  • Combining two campaigns into one production run is possible if the specification is genuinely identical.

There is a second meaning worth stating, because it affects how a creator should plan. The minimum is also the practical floor for a stable unit cost. Below it, fixed costs are spread across fewer units and the price per unit rises steeply, sometimes by 20 to 40 percent on a very small run. Above it, the price falls gradually and then flattens. So the minimum is not just a gate to pass; it is the point on the cost curve where a campaign stops paying a penalty for being small. Volume behaviour is set out on low MOQ bag production for creators.

Why production runs have minimums at all

Minimums are not a policy choice, they are arithmetic. Every production run carries fixed costs that must be incurred whether the order is 100 units or 10,000: fabric is bought in roll or dye-lot quantities, trim and components are bought in supplier lots, print screens are made per colour, cutting patterns and dies are prepared, and a sewing line is set up and run in. None of those costs scale down proportionally with a small order, so below a certain quantity the fixed cost per unit becomes the dominant part of the price.

There is also a yield argument. A sewing line does not run at steady output from the first unit. Operators learn the pattern, the first units are slower, and defects concentrate at the start of a run. On a very short run the learning period is a large share of the whole job, so both the cost and the defect rate are higher. On a run of 500 or more, the learning period is a small share and the average settles. That is one reason a minimum is also a quality measure rather than only a commercial one.

The third reason is material purchasing. Fabric mills sell in roll quantities and dye in lot quantities, and a dye lot has a minimum for a practical reason: dyeing a small quantity is technically harder to shade-match than dyeing a standard lot, and it costs more per metre. Ordering below a mill minimum means either paying a premium, accepting a stock shade that may not match the campaign, or joining an existing production schedule. Each has consequences, and each is easier to manage at 500 units than at 150.

The minimum is arithmetic, not policy

Fabric lots, trim lots, print screens, pattern preparation and line setup are all fixed costs. Below roughly 500 units they dominate the unit price, which is why the minimum exists and why under-ordering is more expensive per unit than it looks.

Style and colourway: how the minimum is counted

The distinction between a style and a colourway is the one that causes the most quoting confusion. A style is a distinct construction: different dimensions, different handle, different interior, different gusset. A colourway is the same construction in a different fabric or print colour. Two totes of identical construction in black and natural are one style in two colourways. A 35 cm tote and a 45 cm tote of identical appearance are two styles, because they have different patterns, different consumption and different packing.

Print variation is the grey area, and it is worth asking about directly. On the same fabric colour, a different print colourway usually does not require a new fabric buy, but it does require new screens and a separate print run, and it may require a minimum per print run rather than per fabric lot. That is often a smaller number than 500, which makes print colourways the cheapest way to offer variety. Ask which variations carry a new fabric minimum and which carry only a print minimum, because the answer changes what is affordable.

How different variations count against the minimum
VariationCounts asTypical effect
Different fabric colourNew colourwayNew fabric minimum, usually 500 pcs
Different sizeNew styleNew pattern, new consumption, new minimum
Different print colour, same fabricPrint runScreens per colour and possibly a print-run minimum
Different print artwork, same fabricPrint runNew screens, same fabric buy
Different handle lengthUsually a style changeNew pattern or a new cutting spec, so ask
Different lining or pocketUsually a style changeAdded operations and a new specification
Same bag, second campaignNew orderCan share tooling and patterns if nothing changed

The practical guidance is to keep the number of styles to one on a first campaign and to express variety through print and fabric colour only where each colour clears the minimum. A single style in one colourway with two print options is the most efficient structure available, and it still gives backers a choice. Where a campaign genuinely needs two sizes, the more efficient route is usually to launch with one and add the second as a stretch goal or a reorder, because two simultaneous styles mean two forecasts and two minimums at the same time.

Fabric minimums: rolls, dye lots and shade

Fabric is bought from a mill in rolls, and a mill will normally quote a minimum quantity per colour and per finish. For a tote in 10 to 12 oz cotton canvas, consumption per unit is modest, so 500 units may consume only part of a mill minimum, which is one reason the number sits where it does. Where a campaign wants a custom dyed shade rather than a stock shade, the mill minimum rises, because dyeing to order is a separate production event with its own minimum and its own shade tolerance.

Shade consistency is the reason this matters commercially. Fabric is dyed in lots, and shade varies slightly between lots. A run made from one dye lot is consistent; a run made from two lots can show a visible difference between bags, which on a tote sitting next to another tote is obvious. That is why a production run is planned from a single lot wherever possible, and why a small order that has to be joined to another lot, or topped up from a second lot later, can produce shade variation the campaign did not budget for.

  • Stock shades are cheaper and faster than custom dyed shades, because the mill minimum does not apply in the same way.
  • Custom dyeing carries a mill minimum and a shade tolerance, and it adds lead time before cutting.
  • One dye lot per run is the goal, because shade varies between lots and the difference is visible.
  • Record the roll and lot numbers at incoming inspection, so a shade question later has evidence attached.
  • Where a top-up run is likely, reserve fabric from the original lot at the time of the first run.

That last point is worth acting on. If a campaign expects to reorder, ask for fabric from the same lot to be reserved when the first run is cut. It costs little to hold, and it removes the most common quality complaint on a reorder, which is that the second batch does not match the first. Our sourcing partner records lot numbers as a matter of routine and will hold remnant fabric where a reorder is anticipated, which is a conversation worth having at quotation stage rather than at reorder stage.

Component and trim minimums

A tote looks simple, but it carries trim: webbing or cotton handle material, thread, a woven or printed label, a care label, and possibly a zip, a magnetic closure, a rivet or a pocket binding. Each of those is bought from a component maker with its own lot minimum. Webbing is commonly sold in roll quantities, labels in the low thousands because the weaving setup dominates, and metal components in the hundreds or thousands depending on the item. The 500-unit tote minimum is partly a reflection of these component lots.

Labels are the clearest example. A woven label has a setup cost that makes small quantities uneconomic, so label makers quote minimums commonly in the region of 1,000 to 3,000 pieces, which is more than a 500-unit tote order needs. The standard solution is to accept a minimum and hold the surplus for the reorder, which is fine if a reorder is likely and wasteful if it is not. The alternative is a printed label or a direct print, which carries a lower minimum and a different look.

Typical trim minimums and how to plan around them
TrimTypical lot minimumPlanning response
Woven labelCommonly 1,000-3,000 pcsAccept and hold surplus for a reorder, or use a printed label
Printed labelCommonly 500-1,000 pcsCloser to the bag quantity, so easier to match
Webbing or handle tapeSold by roll quantityStandard colours are available from stock; custom colours carry a dye minimum
Zip and sliderCommonly 500-1,000 pcsStandardise the gauge across the range to buy once
Metal hardwareCommonly 500-5,000 pcs by itemUse standard finishes rather than custom plating
ThreadLow, but shade-specificSpecify the shade so it is bought with the run

Standardisation is the answer to most trim minimums. If every product in the campaign uses the same zip gauge, the same webbing width and the same label construction, those lines are bought once at the combined quantity rather than separately at several small quantities. That is one of the reasons a campaign range should be designed as a family rather than as a set of unrelated items. It is also the cheapest structural decision available, because it costs nothing to implement and it applies to every trim line at once.

Print carries setup rather than a fabric lot, and the economics differ by method. Screen printing charges setup per colour per design, so a two-colour design carries two screens and a three-colour design three. The setup is a fixed cost, which means the per-unit impact falls as quantity rises, and it means a short run pays a large share of setup per unit. Digital or transfer printing carries little or no setup but a higher per-unit cost, which is why it is often the better choice for a small run despite the higher unit price.

The break-even is worth calculating rather than assuming. If a screen print setup is a fixed amount per colour and the unit cost difference between screen and digital is a known amount per unit, then the quantity at which screen becomes cheaper is simply the setup divided by the difference. That number is often near the low hundreds, which means below roughly 300 to 500 units, digital printing frequently wins on total cost, and above it screen printing wins. Ask for both quotations at the expected quantity rather than assuming the method.

  • Screen print: fixed setup per colour, low unit cost, economical above the break-even quantity.
  • Digital or transfer: little setup, higher unit cost, often cheaper below the break-even quantity.
  • Embroidery: digitising setup plus the highest unit cost, so it suits small motifs and premium positioning.
  • Colour count: the dominant driver of screen setup, so design to a colour limit.
  • Artwork changes: each new design is a new setup, so limit the number of distinct artworks per run.

One consequence that surprises creators: several artworks do not reduce the bag minimum but they do multiply the print setup. A campaign offering three different prints on the same bag still has one 500-piece bag minimum if the fabric is the same, but it has three print setups and three print runs, and each print run may carry its own minimum quantity. The efficient structure is one artwork per 500 units, or a print quantity split agreed in advance. Ask how many artwork splits are included in the quoted price.

A tote bag from the pilot run — Custom Tote Bag MOQ
A tote bag built to the specification discussed here, photographed before it is packed.

Line setup and the economics of a short run

A sewing line is set up for a job: patterns are laid out, cutting is prepared, machines are threaded and adjusted, operators are briefed, and the first units are made slowly while the line settles. That setup is a fixed cost in labour and time, and it is the same whether the run is 200 units or 2,000. On a short run the setup is a large share of the total labour; on a long run it is negligible. This is one of the two main reasons a unit price falls with quantity, the other being material and trim purchasing.

Yield follows the same pattern. Defects concentrate at the start of a run while the line learns the pattern, and the first-pass yield improves as operators settle. On a 500-unit run the learning period might be the first 20 to 50 units; on a 150-unit run it might be the first 20 units of a much shorter job, which is a far larger share. That is why very small runs are both more expensive and more variable in quality, and why a production partner will often prefer to schedule a longer run into the same slot.

There is a scheduling consequence too. A short run occupies a line for less time but still requires a changeover, and changeovers are the enemy of throughput. That is why production slots are allocated by value as well as by quantity, and why a very small order can be harder to schedule than a slightly larger one. Where a campaign genuinely needs a small quantity, being flexible on the production slot is often the most valuable concession available, because it allows the run to be placed where a changeover is already happening.

What happens if you order below the minimum

Ordering below the minimum is possible, and campaigns do it, but it is worth understanding what changes. The unit price rises, typically by 20 to 40 percent on a small run, because the fixed costs described above are spread across fewer units. Lead time may extend, because a small run is harder to schedule. Material options narrow, because stock shades and stock trims are the only economic choices. And the quotation may carry a small-order surcharge as a separate line rather than folded into the unit price, which is worth asking about so the comparison is transparent.

The second consequence is on choice rather than price. Below the minimum, custom dyed fabric, custom trim and custom labels are usually unavailable or uneconomic, so the product is built from stock materials. That may be perfectly acceptable for a simple tote with a strong print, and it is a legitimate way to test a design. What it is not is a route to a bespoke product at a bespoke price. A creator should decide which they need: a bespoke bag at 500 units, or a stock-material bag at fewer. Trying to get both usually produces disappointment.

Ordering at, near and below the minimum
QuantityUnit price effectMaterial choiceScheduling
500 or moreStandard bandCustom fabric, trim and labels availableStandard slot in the 35-50 day window
300-500Modest premium, often 10-20%Most custom options still availableStandard slot, occasionally a shared slot
150-300Premium commonly 20-40%Stock shades and stock trimFlexible slot usually required
Under 150Highest per-unit costStock materials onlyHardest to schedule, and sampling still applies
Sample quantityPer-sample fee, multiple of unit priceAs specified, for evaluation only6-10 working days per round

One thing that does not change below the minimum is sampling. A 150-unit order still needs a sample, still takes 6 to 10 working days per round, and still needs an approved pre-production sample before bulk starts. Creators sometimes assume a small order skips the process, and it does not. That is worth knowing when comparing the cost of a small run against the cost of simply ordering 500 and holding the surplus, because the difference in total cost is often smaller than the difference in unit price suggests.

Strategies that fit a small campaign inside the minimum

There are six workable strategies, and most campaigns can combine two of them. The first is consolidation: one colourway at the full quantity instead of two at half. The second is standardisation: one style with a shared trim set, so nothing carries a second minimum. The third is print variation: several artworks on one fabric colour, which gives variety without new fabric lots. The fourth is add-on ordering: make the tote an add-on and order after the campaign closes, when the quantity is known.

The fifth is surplus planning: order 500, use what is needed, and sell the remainder through the creator's own store after the campaign. A tote is the easiest product in the catalogue to hold and resell, it does not date quickly if the artwork is not tied to an event, and the surplus is effectively bought at the higher-tier unit price. The sixth is sharing a run with another creator whose specification is identical, which is uncommon but possible where two campaigns use the same fabric, construction and trim.

  • Consolidate colourways to one at the full quantity rather than two at half.
  • Standardise trim across the range so each line is bought once at the combined volume.
  • Offer variety through print colourways on a single fabric colour rather than through new fabric colours.
  • Make the tote an add-on and order once demand is known, removing forecast risk.
  • Order 500 and plan to sell surplus through your own store, since totes hold value better than most rewards.
  • Ask whether a shared run is possible if another creator's specification matches yours exactly.

The strategy to be careful with is ordering well below the minimum in the hope of reordering later. A reorder is a new production event, with a new slot in the schedule, and it may use a different fabric lot if the original was not reserved. That means a reorder can cost more per unit and can differ in shade from the first batch. Where a reorder is likely, say so at quotation stage, because reserved fabric and a planned second slot turn a risky reorder into a routine one.

Cost per unit around the minimum

The cost curve around the minimum is steep at first and then flattens. Indicatively, for a 10 to 12 oz canvas tote with a two-colour screen print, FOB Xiamen might run USD 5.50 to 8.00 at 500 pcs, USD 4.50 to 7.00 at 1,000, and USD 4.00 to 6.30 at 2,000. The step from 500 to 1,000 is usually the larger one, commonly 6 to 12 percent, because component and trim lots cross a better price band. The step from 1,000 to 2,000 is smaller, commonly 4 to 8 percent, because what remains is material and labour, which scale close to linearly.

Below the minimum the curve steepens sharply in the other direction. At 250 units the same tote might cost USD 7.00 to 11.00, and at 100 units USD 10.00 to 16.00, because setup, sampling and material minimums are being spread across very few units. That is the arithmetic behind the advice to order 500 and hold surplus: the total cost of 500 units at the standard band is often comparable to the total cost of 250 units at the penalised band, and the campaign ends up with twice the product.

Indicative FOB per unit for a 10-12 oz canvas tote with a two-colour screen print
QuantityIndicative FOBTotal order costNote
100 pcsUSD 10.00-16.00USD 1,000-1,600Stock materials, highest per-unit cost
250 pcsUSD 7.00-11.00USD 1,750-2,750Below the minimum, setup dominates
500 pcsUSD 5.50-8.00USD 2,750-4,000The standard band begins here
1,000 pcsUSD 4.50-7.00USD 4,500-7,000Component lots cross a better band
2,000 pcsUSD 4.00-6.30USD 8,000-12,600Curve flattens, material and labour dominate

Read the total column rather than the unit column when deciding. Ordering 500 units at USD 6.00 costs USD 3,000, while ordering 250 at USD 9.00 costs USD 2,250. The difference in cash is USD 750 and the difference in product is 250 units, which at the campaign's reward price is almost certainly worth more than USD 750. Compare total cost against total usable product, and remember that surplus totes are sellable, whereas a second production run is not free.

Freight is the one line that does not improve with quantity in the way creators expect, because the final parcel to a backer has a floor cost set by the carrier rather than by the order. A larger production order improves the unit production cost, but the per-backer shipping cost is broadly unchanged. That is worth stating plainly: volume helps production cost, carton design helps shipping cost, and they are separate problems. Shipping behaviour is covered in crowdfunding rewards fulfilment.

A tote bag from the pilot run — Custom Tote Bag MOQ
The tote bag this section refers to, from the same run the reward tier ships from.

Top-up runs, reorders and second colourways

A reorder is a new production event, and it repeats the process: sampling if anything has changed, a deposit, a slot in the schedule, and a 35-50 day window. If nothing has changed, the patterns and screens already exist, so the reorder skips development but not production. That means a reorder is faster than a first order but not fast, and a campaign promising delivery to late backers should model 35 to 50 days plus freight from the reorder deposit rather than assuming the units can be made quickly.

Shade is the reorder risk described earlier, and the mitigation is to reserve fabric from the original lot at the time of the first run. Where that was not done, the honest options are to accept a small shade difference, to reorder in a deliberately different colourway so the difference reads as a choice, or to re-dye to match with the lead time and minimum that implies. The second option is often the most practical, because backers generally accept a second colourway and do not accept a mismatched one.

  • Reserve fabric from the original dye lot when placing the first order if a reorder is likely.
  • Keep the approved pre-production sample sealed and dated, so a reorder has an unimpeachable reference.
  • Model a reorder at 35-50 days plus freight from deposit, not as a quick top-up.
  • If shade cannot be matched, reorder in a different colourway so the difference reads as deliberate.
  • Keep screens and patterns on file, since they remove development time from the reorder.

Second colourways are usually better handled as a planned second run than as a variation of the first. If a campaign knows it wants black and natural, and can forecast 500 of each, the clean structure is two colourways in one production order, because fabric, trim and print can be planned together and scheduled in one window. The awkward structure is one colourway first and a second colourway added later, which means two fabric lots, two schedules and a shade decision. Plan colourways together wherever the forecast allows.

A planning checklist before you request a quote

The quality of a quotation depends almost entirely on the quality of the brief, and the brief for a tote is short. Have the dimensions with tolerance, the fabric type and weight, the fabric colour and whether it is stock or custom dyed, the handle specification, the print method, colour count and placement, the label and trim requirements, the quantity per colourway, the destination markets, and the target delivery month ready before asking. A quotation produced from a complete brief is accurate; one produced from a description is an estimate with a wide error bar.

  1. Decide one style and one colourway first, and treat any second as a separate minimum.
  2. Fix the dimensions with a tolerance, commonly plus or minus 5 to 10 mm on a tote.
  3. Choose the fabric type and weight, and decide whether a stock shade is acceptable.
  4. Specify the handle: material, width, drop length and reinforcement at the stress points.
  5. Define the print: method, colour count, artwork files, placement and tolerance.
  6. List trim: labels, care label, any zip or closure, and state which are custom.
  7. State the quantity per colourway and whether a reorder is likely, so fabric can be reserved.
  8. Give the destination markets and the target delivery month, so freight and schedule can be quoted.

Two items on that list deserve emphasis. Saying whether a reorder is likely costs nothing and unlocks reserved fabric, which is the difference between a matching second batch and a mismatched one. Giving the target delivery month lets the production side work backwards from the date through sampling at 6-10 working days, production 35-50 days, and freight, and tell you whether the date is achievable before you publish it rather than after.

Minimum-related questions to ask before signing off
QuestionWhy it matters
Is the minimum per style, per colourway or per print run?Determines what variety is affordable
Does a second print colourway carry a new fabric minimum?Often it does not, which makes print variation cheap
What is the small-order surcharge below 500?Makes the below-minimum option comparable
Can fabric from this lot be reserved for a reorder?Prevents shade mismatch on the second batch
Are trim minimums included or charged separately?Labels commonly carry their own minimum
Which method is cheaper at my quantity?Screen versus digital break-even often sits near 300-500 units
Is my delivery month achievable from today?Works back through sampling, bulk and freight

A 500-piece minimum is not an obstacle to a small campaign; it is a planning constraint that rewards decisions made early. Consolidate colourways, standardise trim, use print variation for variety, and either order the full quantity or plan the reorder properly. Campaigns that do this pay the standard unit price and get a predictable schedule. Campaigns that discover the structure after the campaign closes end up choosing between a premium and a compromise. Category detail is on custom tote bags for Kickstarter, volume mechanics on low MOQ bag production for creators, and perk pricing in custom tote bags as a 29 dollar perk.

The minimum is not a barrier, it is a planning constraint. Decide colourways before you quote, not after you fund.

Programme coordinator, MOQ briefing
Minimum order quantity
500 pcs per style / colourway
Below-minimum premium
Commonly 20-40% on small runs
Typical step, 500 to 1,000
6-12%
Typical step, 1,000 to 2,000
4-8%
Sampling
6-10 working days per round
Bulk production
35-50 days
Inspection
AQL 2.5 to ISO 2859-1
Woven label minimum
Commonly 1,000-3,000 pcs
Print method break-even
Often near 300-500 units, screen versus digital
Trade term
FOB Xiamen
Payment terms
T/T 30/70
Capacity available
200,000 pcs per month

Get your tote quantity and colourway plan costed

Send your dimensions, fabric weight, print method and quantity per colourway to service@junyuanbags.com. Our production team will return pricing at 500, 1,000 and 2,000, plus the below-minimum option and a schedule against your delivery month.

Frequently Asked Questions

What does a 500-piece minimum mean for a custom tote bag?

It means 500 pcs per style and per colourway, not 500 across the campaign. A bag in two fabric colours at 250 each is two orders below the minimum, so consolidate to one colourway at 500 or ensure each colourway clears it.

Why is there a minimum at all?

Because fabric, trim and print setup are fixed costs that do not scale down. Below roughly 500 units they dominate the unit price, and a short run also has a higher defect share because the line learning period is a larger part of the job.

Is a different print colourway a new minimum?

Usually not a new fabric minimum, but it does need new print screens and its own print run, which may carry a print-run minimum. Print variation is therefore the cheapest way to offer variety on one fabric colour.

Can I order fewer than 500 totes?

Yes, but expect a premium commonly in the region of 20 to 40 percent, narrower material choice, and a harder scheduling slot. Sampling at 6-10 working days per round still applies, which is why ordering 500 and holding surplus is often cheaper in total.

How much does the unit price fall from 500 to 2,000?

Typically 10 to 25 percent for the same specification, with the larger step between 500 and 1,000 at around 6 to 12 percent and a smaller step from 1,000 to 2,000 at around 4 to 8 percent.

What is the minimum for woven labels?

Commonly 1,000 to 3,000 pieces, because the weaving setup dominates. The usual response is to accept the minimum and hold the surplus for a reorder, or to use a printed label with a lower minimum.

Which print method is cheaper for a small tote run?

Often digital or transfer below roughly 300 to 500 units, because screen printing carries a fixed setup per colour. Calculate the break-even by dividing the setup by the per-unit difference rather than assuming screen is cheaper.

How do I avoid shade differences on a reorder?

Reserve fabric from the original dye lot when placing the first order. If that was not done, either accept the difference, reorder in a deliberately different colourway, or re-dye to match with the minimum and lead time that implies.

How long does a reorder take?

A reorder repeats production but not development, so patterns and screens already exist. Model 35-50 days plus freight from the deposit, not a quick top-up, and confirm the production slot in advance.

Is it better to offer two sizes or one?

One, on a first campaign. A second size is a new style with its own pattern, consumption and minimum, and it doubles the forecasting problem at the same time. Add the second size as a stretch goal or a reorder.

Does a larger order reduce shipping cost per backer?

Not much. The final parcel has a floor set by the carrier rather than by order size, so volume improves production cost while carton design improves shipping cost. Treat them as separate problems.

What should I include in a request for quotation?

Dimensions with tolerance, fabric type and weight, fabric colour and whether it is stock or custom dyed, handle specification, print method and colour count with placement, trim requirements, quantity per colourway, destination markets and the target delivery month.

People Also Ask

Is 500 pieces a lot for a first campaign?

It is the standard entry point and it is usually achievable, because a tote is often an entry or add-on tier with wide demand. If 500 feels high, consolidate colourways and use print variation rather than ordering below the minimum.

Can two creators share a production run?

Occasionally, if the specification is genuinely identical: same fabric, construction, trim and print. It is uncommon, but worth asking where two campaigns are launching together with the same product.

What should I do with surplus totes?

Sell them through your own store after the campaign. Totes hold value better than most rewards, do not date quickly if the artwork is not event-specific, and were bought at the better unit price.

Does the minimum apply to samples?

No. Samples are charged per unit at a multiple of the bulk price and take 6-10 working days per round. The minimum applies to bulk production, not to sampling.

Why is my two-colourway order quoted at the 500 price?

Because each colourway carries its own minimum. Two colourways at 500 each is a 1,000-unit order priced as two 500-unit runs, which is why consolidating to one colourway at 1,000 usually reaches a better band.

Should I use stock fabric to reduce the minimum?

It helps. Stock shades avoid a mill dye minimum and shorten lead time, which is often what makes a smaller or faster run viable. The trade-off is a narrower colour choice.

What tolerance should I set on tote dimensions?

Plus or minus 5 to 10 mm is common, measured on the finished unit. Where the bag is intended to carry a specific object, such as records or a laptop, measure internal dimensions after any expected shrinkage.