How to Write a Bag Spec Sheet for a Fast, Accurate Quote
What does a bag spec sheet need to produce an accurate quote in one exchange? Eight sections: product identity, dimensioned drawing with tolerances, materials by layer, a hardware table with references, construction and reinforcement notes, decoration coordinates, packing and compliance, and commercial terms. Sampling then runs 6-10 working days and production 35-50 days. This article sets out each section, with the exact fields a production partner prices from.

- Why the spec sheet is the fastest lever on quotation speed
- What a quotation needs and what it cannot price
- Section 1: product identity and intended use
- Section 2: dimensions, tolerances and capacity claims
- Section 3: materials by layer
- Section 4: hardware and trim table
- Section 5: construction and reinforcement
- Section 6: decoration coordinates and artwork
- Section 7: labelling, compliance and packing
- Section 8: commercial terms, quantity and delivery
- Spec sheet mistakes that produce wrong quotations
- A worked example spec sheet
- The RFQ email that gets an answer inside a week
Why the spec sheet is the fastest lever on quotation speed
A quotation is a calculation, and a calculation needs inputs. Every field left blank in a spec sheet becomes a question, and every question travels from the production team to you and back before the next step can start. Three rounds of clarification is two to three weeks on a programme that is already running 12-16 weeks from specification lock to backer doorstep. The creator who sends eight complete sections receives a unit cost, a sampling estimate and a production window in a single exchange; the creator who sends a sketch and a quantity receives a guess.
There is a second benefit that matters more than speed. A written specification is the reference against which the sample is built, the pre-production sample is approved and the finished run is inspected at AQL 2.5 to ISO 2859-1. In other words, the same document that accelerates the quotation also protects you at the two moments when money changes hands: the 30% deposit and the 70% balance. For the wider programme context, the bag manufacturing page shows where the spec sheet sits.
- Minimum order quantity
- 500 pcs per style / colourway
- Sampling
- 6-10 working days (12-15 for complex builds)
- Bulk production
- 35-50 days after deposit + approved pre-production sample
- Inspection
- AQL 2.5 to ISO 2859-1
- Trade term
- FOB Xiamen
- Payment
- T/T 30/70
- Production floor
- 4,950 m² SGS-verified, 137 staff, 7 lines, 149 machines
- Monthly capacity
- 200,000 pcs per month
- Programme contact
- service@junyuanbags.com
Key takeaways on writing a spec sheet
- Eight sections, one block each: identity, dimensions, materials, hardware, construction, decoration, packing and terms.
- Every dimension needs a tolerance; a dimension without one cannot be inspected.
- Name hardware by reference, not by description, so substitution cannot happen silently.
- Decoration placement must be measured from a named seam, not described as centred.
- State the inspection standard in the spec so it is quoted rather than negotiated later.
- Say what you do not know yet — a flagged unknown is cheaper than a hidden assumption.
What a quotation needs and what it cannot price
It helps to understand what happens on the other side of your email. A programme coordinator reads a spec sheet and converts it into four things: a material purchase list, a component purchase list, an operations estimate for cutting and sewing, and a packing and freight estimate. Each of those four has a price and a lead time attached. What cannot be priced is intent: the sense that a bag should feel premium, or that it should be durable, because neither premium nor durable is a purchasable item.
| Cost block | Required inputs | What happens if inputs are missing |
|---|---|---|
| Materials | Fabric denier, weave, coating, colour, quantity per bag | An assumption is made and the price moves at sample stage |
| Components | Type, size, finish, quantity, stock or custom | A stock substitute is quoted and the real part costs more |
| Cutting and sewing | Panel count, seam types, reinforcements, pocket count | Labour is underestimated and the quote rises after sampling |
| Decoration | Method, colours, size, placement, artwork version | Set-up is omitted and appears as a change order |
| Packing | Pieces per carton, carton spec, retail packaging | Freight is quoted on guesswork and volumetric cost is wrong |
| Compliance | Destination market and required standards | Testing and relabelling surprise you after the run |
The practical rule is that any sentence in your spec sheet containing a comparative or qualitative word — sturdy, premium, high quality, heavy duty — should be replaced with a number, a reference or a named standard. This is not bureaucracy. It is the difference between a quotation that holds and a quotation that is revised once someone has to buy real materials against it.
Section 1: product identity and intended use
Start with the basics, because they set the defaults for everything downstream. Category tells the production team which construction patterns to reference; intended use tells them what load the bag has to survive; and the target user tells them what tolerances matter. A laptop backpack destined for daily commuting is specified differently from a cosmetic bag that will sit in a bathroom, even if both are made from the same fabric, and stating the difference at the top saves corrections later.
- Category: backpack, tote, duffle, travel bag, gym bag, laptop bag, cosmetic bag or a hybrid, named plainly.
- Intended use: daily commute, travel, gym, field work, retail presentation or event gifting.
- Target user and load: what the bag carries, at what weight, for how many cycles a day.
- Hero feature: the single thing the campaign page will lead with, so it is protected in the build.
- Reference product: a link or photograph of something close to your intent, used for direction only.
- Style count and colourway count, since the 500 pcs minimum applies per style and per colourway.
Section 2: dimensions, tolerances and capacity claims
Dimensions are the most frequently incomplete section, and incompleteness here is expensive because every other measurement hangs off it. Give external dimensions in centimetres, internal dimensions where they matter, and a tolerance for each. The tolerance is the part creators omit: without it, a bag that measures 2 cm short is arguably conforming, and you will have no basis for a rejection at inspection. Where a capacity claim is made, state the volume and the method used to measure it.
| Field | Example entry | Standard tolerance |
|---|---|---|
| External width | 30.0 cm | ±0.5 cm |
| External height | 45.0 cm | ±0.5 cm |
| External depth | 15.0 cm | ±0.5 cm |
| Internal laptop sleeve | 35.5 × 24.0 cm, fits 15-inch class | ±0.3 cm |
| Strap length, adjustable | 50-90 cm | ±1.0 cm |
| Handle drop | 22.0 cm | ±0.5 cm |
| Capacity claim | 22 litres measured by fill test | ±5% |
| Weight | 780 g | ±5% |
Two further notes. First, if the bag must fit a specific device, name the device family and measure the sleeve to fit it with clearance, because a sleeve cut to exactly the device dimensions will not accept a case. Second, if the bag has to fit an airline personal-item sizer or a standard carry-on gauge, state that gauge in the spec; it is a hard constraint that changes panel dimensions and is much cheaper to design in than to correct.
Section 3: materials by layer
Write materials as a layer list rather than as a single line. A bag is a shell fabric, often a lining, sometimes an interlining or foam, plus webbing, binding and thread. Each layer is a separate purchase with its own price and its own availability, and naming them separately is what makes a quotation accurate. Where you have a swatch or a supplier code, include it; where you do not, describe the fabric by denier, weave and coating and ask for a recommended equivalent.
| Layer | Fields to complete | Example |
|---|---|---|
| Shell / face fabric | Denier, weave, coating, colour, finish | 600D polyester, plain weave, PU coated, black |
| Secondary or accent fabric | Same fields, plus placement | 420D ripstop nylon, front panel lower third |
| Lining | Denier or GSM, colour, whether printed | 210D polyester, grey, plain |
| Interlining or foam | Type, thickness, placement | 3 mm EVA foam, back panel and base |
| Webbing | Width, material, breaking strength, colour | 25 mm polyester webbing, 600 kg breaking strength |
| Binding tape | Width, material, colour | 20 mm polyester binding, matched to shell |
| Thread | Type and ticket number | Polyester bonded thread, Tkt 40 |
Availability is the hidden cost driver in this section. Stock fabrics in stock colourways keep sampling inside 6-10 working days; a custom-dyed fabric adds 15-25 working days before cutting begins. If your brand colour is non-negotiable, decide that at RFQ stage and accept the days, rather than discovering the requirement after the sampling slot has been booked. The material customisation page sets out stock versus custom options and what each costs in calendar.
Section 4: hardware and trim table
Hardware should be a numbered table, one row per component, because it is a purchasing document. The columns that matter are reference, type, size, finish, quantity per bag, and whether the item is stock or custom. The last column is the one that carries calendar: stock items are issued from inventory, custom items need tooling at 15-20 working days before the first unit can be sewn.
| Ref | Component | Specification | Qty per bag | Stock or custom |
|---|---|---|---|---|
| H-01 | Main compartment zip | YKK #8 reverse coil, auto-lock slider, black nickel | 1 | Stock |
| H-02 | Front pocket zip | YKK #5 coil, auto-lock, black nickel | 1 | Stock |
| H-03 | Shoulder strap adjuster | 25 mm ladder lock, black POM | 2 | Stock |
| H-04 | Side-release buckle | 25 mm side-release, black POM | 1 | Stock |
| H-05 | D-ring | 25 mm metal D-ring, gunmetal | 2 | Stock |
| H-06 | Brand puller | Moulded logo puller, matte black | 1 | Custom, tooling 15-20 days |
| H-07 | Base feet | Moulded rubber feet, black | 4 | Stock |
- Use one reference code per component and reuse it in the tech pack, the artwork notes and the QC defect list.
- Mark custom items explicitly and ask for the tooling cost and lead time to be quoted as separate lines.
- State the finish, not only the colour: black nickel, gunmetal, antique brass and matte black are different purchases.
- Add a spare allowance, typically 2%, so a damaged component does not stop the line on day 30.
- Ask for the re-order price of any custom tooling to be held open for a defined period after the first run.
Section 5: construction and reinforcement
This is the section that converts a bag that looks right into a bag that survives. It is also the section most often left to the production team's discretion, which is a mistake: defaults exist, and they are the defaults of the cheapest viable construction rather than the defaults your backers expect. State the stitch density on load-bearing seams, name the reinforcement at every strap and handle attachment, and say how raw edges are finished inside.
- Panel count and layout: state how many shell panels the design uses, since panel count drives cutting and sewing time.
- Seam type and density: for example 8-10 stitches per inch on all load-bearing seams, with the seam type named.
- Reinforcement: bar-tack or box stitch at every strap, handle and buckle attachment, with the stitch length stated.
- Edge finishing: bound, overlocked or turned, stated per location rather than globally.
- Structure: name any interlining, foam or frame sheet and where it sits.
- Load testing: state any cycle or pull test you expect, so the construction can be built to meet it.
- Weight-bearing points: list them explicitly, because these are what fail first in the field.
A bar-tack at a strap attachment costs cents and prevents the single most common field failure on a campaign bag: a handle pulling away from the shell. Write the reinforcement into the spec rather than assuming it, because the default construction may not include it.
Section 6: decoration coordinates and artwork
Decoration is specified twice: once as artwork files and once as placement coordinates in the spec. The files say what to print; the coordinates say where. Coordinates must be measured from a named seam or edge in millimetres, with a tolerance, because centred or on the front panel cannot be measured and therefore cannot be inspected. State the method per placement too — a logo can be embroidered on one panel and screen printed on another.
| Placement | Method | Size | Coordinate from named seam | Tolerance |
|---|---|---|---|---|
| Front panel, lower centre | Screen print, 1 colour Pantone 432 C | 90 × 40 mm | 40 mm above bottom seam, centred on width | ±2 mm |
| Shoulder strap, left | Woven label | 50 × 15 mm | 120 mm below top attachment seam | ±2 mm |
| Interior lining | Printed satin care label | 60 × 30 mm | Side seam, 80 mm from base | ±3 mm |
| Zip pull | Printed cord, 1 colour | 8 mm diameter | Both ends heat-shrink finished | ±1 mm |
| Side panel | Embroidery, 2 colours | 60 × 60 mm | Centred, 50 mm from front seam | ±2 mm |
Attach the artwork files with a version number and state which version is current. Artwork and placement are the two areas where a mismatch between documents produces a run decorated to the wrong revision, which is discovered at inspection and costs 10-20 days to rework. Our print and embroidery page gives the file formats and minimum sizes for each method.
Section 7: labelling, compliance and packing
Labelling and packing look like afterthoughts and are anything but. Compliance text has to be set into label artwork before bulk starts, because adding it afterwards means a second decoration pass on finished goods. Packing specification determines carton dimensions, which determine volumetric weight, which determines freight cost — so a packaging decision made late can change the landed cost in your budget after the campaign has closed.
- Compliance text: fibre content, country of origin, care symbols, and market-specific items such as CPSIA tracking labels or EU GPSR identification.
- Label types and placement: woven, printed satin or heat transfer, each with artwork attached and a position named.
- Retail packaging: state whether single polybag, hang tag, insert card, tissue or a barcode sticker is required.
- Carton specification: pieces per carton, carton dimensions, board grade and marking requirements.
- Packing method: folded flat, stuffed, or packed with inserts, since this changes volume and creasing risk.
- Destination market: name the country or region so compliance and freight can be quoted correctly.
The single most expensive omission on a bag spec sheet is the destination market. Without it, compliance is assumed rather than specified, and a REACH, Prop 65 or EU GPSR obligation discovered after the run means testing or relabelling finished goods. One line naming the market prevents it.
Section 8: commercial terms, quantity and delivery
Finish with the commercial frame, because it determines which price you are comparing when you receive several quotations. State the quantity per style and per colourway, the trade term, the payment structure you expect, the inspection standard, and the delivery month you intend to publish. Without these, two quotations can differ by more than the difference between the products, simply because one includes freight and the other does not.
| Field | Standard entry | Why it belongs in the spec |
|---|---|---|
| Quantity | 500 pcs per style / colourway | Sets the price tier and the material purchase |
| Colourway split | 1 colourway first run | Each extra colourway is a separate 500 pcs commitment |
| Trade term | FOB Xiamen | Defines who pays freight, insurance and clearance |
| Payment | T/T 30/70 | Deposit timing must fit the funding schedule |
| Inspection | AQL 2.5 to ISO 2859-1, level II | Makes the quality gate quoted rather than assumed |
| Target delivery month | Stated as a month, not a date | Lets the production slot be reserved realistically |
| Price validity requested | 30-60 days | Protects the quote while you finalise the campaign |
| Volume tiers requested | 500, 1,000, 3,000 pcs | Lets stretch goals be modelled without renegotiation |
Spec sheet mistakes that produce wrong quotations
The errors below are the ones that generate the largest gap between an initial quotation and the final invoice. Notice that none of them involve the design being wrong; they all involve the specification being incomplete, which produces an assumption on the pricing side that later proves false.
| Error | What gets assumed | Consequence |
|---|---|---|
| No tolerance on dimensions | Standard tolerance applies | A size dispute cannot be resolved at inspection |
| Fabric named loosely | A cheaper equivalent is priced | Price rises once the real fabric is sourced |
| Hardware described, not referenced | Stock substitute quoted | Custom part adds cost and 15-20 days |
| Reinforcement not stated | Default construction priced | Field failures after delivery, not at inspection |
| Decoration placement vague | Placement chosen on the line | Units inconsistent; rework at 10-20 days |
| Packing unspecified | Bulk polybag packed | Volumetric freight cost higher than budgeted |
| Destination omitted | Generic compliance assumed | Testing or relabelling after the run |
There is one further mistake worth naming separately: sending a spec sheet and then verbally amending it in a call. Verbal amendments are the origin of most it was agreed conversations. Put every change into the document, issue a new revision number, and make sure the sample and the pre-production sample are built to the latest revision. Our QA and QC page explains how revision control is verified before cargo is released.
A worked example spec sheet
Below is a condensed worked example for a commuter backpack at 500 pcs in one colourway. It is deliberately ordinary, because ordinary specifications are what most campaign programmes need: the point is completeness rather than cleverness. Every line is either a number, a reference or a named standard, which is what allows it to be priced, sampled and inspected.
| Section | Entry |
|---|---|
| Identity | Commuter backpack, daily carry, 15-inch laptop class, hero feature is the suspended laptop sleeve |
| Dimensions | 30 × 45 × 15 cm, all ±0.5 cm; laptop sleeve 35.5 × 24.0 cm; capacity 22 litres by fill test |
| Shell | 600D polyester, plain weave, PU coated, black, stock colourway |
| Lining | 210D polyester, grey; 3 mm EVA foam at back panel and base |
| Hardware | H-01 YKK #8 reverse coil; H-02 YKK #5 coil; H-03 25 mm ladder lock ×2; H-04 25 mm buckle; all stock |
| Construction | 8-10 spi on load seams; bar-tack 12 mm at all strap and handle points; bound interior edges |
| Decoration | Front screen print 1 colour, 90 × 40 mm, 40 mm above bottom seam ±2 mm; woven label on strap |
| Packing | 1 pc per polybag, 20 pcs per carton, carton 60 × 40 × 40 cm, hang tag 1 per bag |
| Commercial | 500 pcs, 1 colourway, FOB Xiamen, T/T 30/70, AQL 2.5 level II, delivery month stated |
The RFQ email that gets an answer inside a week
Put all eight sections in one document and send it with the artwork files, the quantity and the delivery month. Ask for three specific things back: a unit cost at your quantity, a sampling estimate with the number of days and any custom tooling flagged, and a production window with start and completion dates. Asking for those three explicitly is what turns an email into a plan.
- Attach the tech pack as a PDF with a revision number and a date in the file name.
- Attach artwork as vector masters plus a PDF proof, with the version number stated in the email body.
- List the quantity per style and colourway separately, and flag any stretch-goal variant you may add.
- State the destination market and the compliance standards you need, named one by one.
- Confirm the trade term and payment terms you expect, or ask for alternatives to be quoted side by side.
- Ask for the volumetric calculation so landed cost can be modelled before the campaign closes.
- Request that any assumption made on your behalf is listed explicitly in the quotation.
- Ask for the re-order price on the same tooling and artwork to be held open for a stated period.
If you would like a second pair of eyes on the document before you send it, request a quotation and attach the draft; our production team will flag any line that is still ambiguous. Campaigns we support typically close the quotation loop in under a week when the spec sheet is complete, and take three to four weeks when it is not. The low minimum production page explains how the 500 pcs minimum shapes that first order.
- Bag manufacturing for campaign creators
- Material customisation for Kickstarter bags
- Print and embroidery for custom bags
- Crowdfunding bag sample prototyping
- Kickstarter campaign bag QA and QC
- Low minimum bag production for creators
- Request a quotation
Send one document and get a real number
Attach your eight-section spec sheet, artwork files and target quantity. As your production partner we will return a unit cost, a sampling estimate with any tooling flagged, and a production window you can publish to backers. Write to service@junyuanbags.com or use the quotation form.
Frequently Asked Questions
What should a bag spec sheet include?
Eight sections: product identity and intended use, dimensioned drawing with tolerances, materials by layer, a hardware table with references, construction and reinforcement notes, decoration coordinates with artwork, labelling and packing, and commercial terms. Every line should be a number, a reference or a named standard.
How detailed does a bag tech pack need to be?
Detailed enough that someone who has never spoken to you can buy the materials and build the bag. In practice that means dimensions with tolerances, fabric by denier and coating, hardware by reference, stitch density, reinforcement points, decoration coordinates and the packing specification.
Why do bag quotations change after the first sample?
Because an assumption in the original specification proved false. Common causes are a loosely named fabric, a hardware item described rather than referenced, reinforcement that was never specified, and decoration placement that had to be invented on the line. Each one is preventable at spec stage.
What tolerance should I put on bag dimensions?
Use ±0.5 cm on external dimensions, ±0.3 cm on internal sleeves, ±1.0 cm on adjustable strap lengths and ±5% on weight and capacity claims. A dimension without a tolerance cannot be measured at inspection, so it cannot be used to reject non-conforming units.
Do I need to specify thread and stitch density?
Yes. State the stitch density on load-bearing seams, typically 8-10 stitches per inch, and name the reinforcement at every strap, handle and buckle attachment. These are the points that fail in the field, and the default construction may not include the reinforcement you assume.
How do I specify logo placement so it can be inspected?
Give a measurement in millimetres from a named seam or edge, with a tolerance, for example 40 mm above the bottom seam, centred on width, ±2 mm. Phrases such as centred on the front panel cannot be measured, so they cannot be checked at AQL 2.5 under ISO 2859-1.
Should the spec sheet state the inspection standard?
Yes. State AQL 2.5 to ISO 2859-1 at general inspection level II, and define your critical, major and minor defect classes. Naming the standard in the specification means it is quoted and built into the plan rather than negotiated after production has started.
How much does packing specification affect freight cost?
Materially. Pieces per carton and carton dimensions determine volume, and freight is charged on volume or weight, whichever is greater. A bulky bag packed at low density can be charged on volumetric weight, which sometimes changes the freight mode you should choose.
Can I get a quotation with a sketch instead of a spec sheet?
You can receive an estimate, but it will carry assumptions. A sketch plus a quantity typically produces three rounds of questions and a range rather than a price. Eight complete sections produce a unit cost, a sampling estimate and a production window in one exchange.
What is the minimum quantity I should put on the spec sheet?
The minimum is 500 pcs per style and per colourway. Write the quantity per style and per colourway separately, because three colourways of one style is three separate 500 pcs commitments unless it is negotiated as a single run with a colour split.
Should I include stretch-goal variants in the first spec sheet?
Yes. Ask for volume pricing at 500, 1,000 and 3,000 pcs and for any variant to be priced now. A stretch goal priced during the original RFQ is a confirmation on re-order rather than a fresh negotiation, which saves weeks after the campaign closes.
How long does it take to get a quotation from a complete spec sheet?
Campaigns we support typically close the loop in under a week when all eight sections are complete and the artwork is attached. Incomplete specifications take three to four weeks because every missing line becomes a question that has to travel to you and back.
People Also Ask
What is the difference between a spec sheet and a tech pack?
In practice they are the same document. Spec sheet is the commercial term used at quotation stage; tech pack is the production term used once the sample is being built. Both should contain dimensions, materials, hardware, construction and decoration detail.
Do I need a technical drawing for a bag quotation?
A dimensioned drawing is strongly recommended. It does not need to be CAD-perfect, but it must show external dimensions, panel layout and decoration placement with measurements from named seams.
Can I use a competitor's product photo as my spec?
Use it as a reference for direction, not as the specification. A photograph cannot state denier, coating, gauge or tolerance. Write the measurable detail separately and attach the photo as supporting context.
How do I spec a bag that must fit a specific laptop?
Name the device class, then make the sleeve 5-10 mm larger than the device in each dimension so a case still fits. State the internal sleeve size in millimetres with a tolerance of ±0.3 cm, and sample it with the actual device.
What if I do not know which fabric to choose?
Describe the performance you need — abrasion resistance, weight, water resistance, sustainability claim — and ask for two or three stock options with swatches. Choosing a stock fabric keeps sampling inside 6-10 working days.