Crowdfunding Bag Fulfillment: From Production Line to Backer Doorstep
A reward bag passes through nine physical handovers between the production line and a backer door, and each one needs a document. The chain is release and packing, inland haulage, FOB Xiamen handover, ocean transit and clearance, drayage, warehouse receiving, allocation, pick and pack, and last mile with the return loop. Build in 8 to 12 weeks, hold 1 to 3 percent safety stock, and treat every handover as a place where a document prevents a dispute. Order 2 to 5 percent overage on the run itself, because the marginal unit at the top of a run costs less than the average across it.
- Mapping the physical path of a reward bag
- End of line: packing, polybags and carton specification
- Inspection to AQL 2.5 and the release decision
- Inland haulage to port and the FOB Xiamen handover
- Ocean transit, clearance and drayage to the warehouse
- Receiving, count verification and put-away
- Allocation logic: who gets the first wave
- Pick, pack, label and carrier handover
- Last mile, exceptions and the return loop
- Building a buffer: safety stock and re-order triggers
.jpg)
There is a moment in every funded bag campaign when the abstract becomes physical: the run is finished, inspected and sitting in cartons, and someone has to move it several thousand kilometres to 1,200 individual front doors. Most of the anxiety at that point is misplaced. The risk is rarely in the ocean leg, which is a mature and reliable industry. It is in the handovers, because every transition between two parties is a place where a count can be disputed, a document can be missing, or a decision can be nobody's job.
The useful way to plan this is to map the nine handovers and ask two questions about each: what document proves the transfer, and what decision has to be made before it. Do that and the fulfilment plan stops being a feeling and becomes a schedule with named owners. It also makes the cost visible, because each handover has a charge attached that a single-line shipping estimate will not show.
The timeline that comes out of the mapping is longer than most creators expect. Bulk production runs 35 to 50 days. Inspection and release add a few days. Inland haulage, export clearance and loading add roughly 3 to 7 days. Ocean transit runs 25 to 40 days port to port. Import clearance and inland delivery to the warehouse add 7 to 14 days. Receiving and put-away add 3 to 7 days. Pick, pack and last mile add 1 to 3 weeks depending on the wave plan. Eight to twelve weeks is the honest figure, and the campaigns that communicate that number from the start are the ones whose backers stay calm. The commercial side of this is set out in our crowdfunding rewards fulfilment guide.
Nine handovers, nine documents. Map each one with a named owner and a proving document, and fulfilment stops being a feeling and becomes a schedule.
Mapping the physical path of a reward bag
The nine stages, in order, are: end of line packing, where finished units are polybagged and cartoned; inspection and release, where the lot is checked and authorised to ship; inland haulage, where cartons move to the port; export clearance and loading, where the shipment is declared and loaded; ocean transit, where it crosses; import clearance and drayage, where it is cleared and moved to the warehouse; receiving and put-away, where the warehouse counts it and shelves it; allocation and pick-pack, where it is matched to backers and boxed; and last mile, where the carrier delivers it.
Each transition generates a document and each document has a purpose. The packing list proves what was packed. The inspection report proves the goods were checked and to what standard. The bill of lading proves the carrier received the container and is the document of title. The commercial invoice and packing list drive the import declaration. The goods-in receipt proves the warehouse received what was sent. The pick list proves which unit went to which backer. The manifest proves what was handed to the carrier. The tracking reference proves it was delivered.
The reason to be this explicit is that a dispute without a document is a negotiation, and a negotiation at the wrong moment costs weeks. If the warehouse says it received 492 cartons and the packing list says 500, the resolution depends entirely on whether there is a signed goods-in receipt with a discrepancy noted on the day. If there is, the claim goes to the carrier against the bill of lading. If there is not, it becomes a conversation about whose count is right, three weeks after the last backer was expecting a parcel.
Two stages deserve a named owner and a decision that most campaigns leave implicit. Release needs a named person who authorises the shipment after inspection, because the alternative is a container leaving while a defect question is still open. Allocation needs a named person who decides the wave order, because the alternative is the warehouse choosing, and the warehouse will choose by whatever is easiest to pick rather than by what is best for your backers.
End of line: packing, polybags and carton specification
The packing stage is where the quality of the delivery experience is largely determined, and it is specified far too late. Three decisions matter. The polybag protects the unit from abrasion and moisture inside the carton. It should be specified by material and thickness, commonly a 0.03 to 0.05 mm polyethylene bag, and it should carry ventilation holes if there is any chance of residual moisture, because a sealed bag around a slightly damp textile product is how mildew starts.
The fold determines both the carton size and the condition on arrival. A bag folded along its natural lines, lightly stuffed with paper to hold shape, packs smaller and arrives better than one compressed flat. This should be a written instruction with a photograph, because *fold neatly* means different things to two operators. Where the product has a structured panel or a padded laptop sleeve, the fold has to avoid creasing that panel, and the instruction should say so explicitly.
The master carton protects the goods across the ocean leg and determines the freight cost. Specify the board grade and wall, the internal dimensions, the maximum gross weight, which should stay under roughly 15 to 20 kg for safe manual handling, and the units per carton. Then specify the carton marking: the shipping mark, the SKU, the colourway, the quantity and a sequential carton number such as *carton 12 of 84*. A sequential number turns a count dispute into a simple question about which number is missing.
Two additions pay for themselves. Desiccant in the master carton protects against condensation during a 25 to 40 day ocean transit, which is the single most common cause of a mould claim on a textile shipment, and it costs cents per carton. A packing photograph set of the sealed cartons, the pallet and the container loading is the evidence you will want if a damage claim is made against the carrier. Our team takes these as standard at every release, and they have settled more than one claim.
.jpg)
Inspection to AQL 2.5 and the release decision
Inspection is the gate between production and shipping, and it is the last point at which a problem can be fixed cheaply. The standard used across our programme is AQL 2.5 to ISO 2859-1, which is a statistical method: you look up the lot size, choose an inspection level, normally general level II, and the tables give a sample size and accept and reject numbers for each defect class. At 500 pcs that is a sample size of 50 units, with an accept number of 3 and a reject number of 4 for minor defects.
Defects are classified in three tiers, and the classification is what makes the result actionable. Critical defects affect safety or make the product unusable, and the acceptance number is normally 0. Major defects are ones a backer would notice and be dissatisfied by, typically held at AQL 2.5. Minor defects are ones a backer might notice, typically at AQL 4.0. The distinction matters because a lot with 4 minor defects and 0 major in 50 units is a different commercial situation from one with 1 critical.
The inspection is only meaningful if there is something to check against, which is why the approved golden sample has to sit at the centre of it. The inspector compares the pulled units against the approved reference: the dimensions on the measurement sheet, the materials on the approved list, the colour against the retained swatch, the hardware against the approved part, and the construction against the photographs in the sample file. Without that reference the inspection is a generic check that will pass a bag that is wrong.
The release decision is the part most campaigns leave undefined, and it should be a named person with a written authority. The sensible structure is a three-outcome gate: release, where the lot passes and is authorised to ship; release with rework, where a specific defect is corrected and the affected units re-inspected before shipping; and hold, where the lot fails and a decision is needed. Rework is common and manageable on a soft product, because most defects are stitching or finishing issues that can be corrected. Build 3 to 7 days of rework allowance into the schedule, because a lot that needs rework and has no allowance produces a delay nobody budgeted for.
Inland haulage to port and the FOB Xiamen handover
Under FOB Xiamen terms, the responsibility split is specific and worth knowing precisely. The seller is responsible for getting the goods to the port of loading, export-cleared and loaded onto the vessel. The buyer is responsible from the point the goods pass the ship's rail, meaning ocean freight, insurance and everything downstream. In practice, using the updated Incoterms language, the key point is that risk transfers when the goods are on board, and the documents that prove it are the bill of lading and the export declaration.
The practical consequence for a creator is that the buyer is responsible for booking the vessel, even though the seller handles the inland movement. This surprises people who assume that FOB means the programme arranges everything to the destination. It does not. Under FOB you, or your freight forwarder, nominate the carrier and the sailing, and you need to do that 2 to 3 weeks before the inspection release date, because space on the main lanes is not always available at short notice and rates move with the booking window.
The inland leg itself is short but not instantaneous. Trucking from the production site to the port, export clearance, container stuffing if it is an LCL shipment, and terminal handling typically add 3 to 7 days after release. Where the shipment is LCL, meaning less than container load, add time for consolidation at the origin warehouse, because your cartons are being combined with other shippers' goods into one container. LCL is usually 3 to 7 days slower door to door than a full container for exactly this reason.
The document set at this handover is the bill of lading, the commercial invoice, the packing list, the certificate of origin where required, and any test reports the destination requires. Send the set to your forwarder and your warehouse before the vessel sails, not after, because the import declaration can be prepared in advance and doing so removes days from the clearance window. Our programme coordinator issues the full document set at release precisely so that the downstream parties are not waiting on paperwork.
Ocean transit, clearance and drayage to the warehouse
Ocean transit on the main east-west lanes runs roughly 25 to 40 days port to port, and the variance is caused by routing rather than by the vessel's speed. A direct service is faster; a service with one or two transhipments adds 5 to 14 days, because the container is unloaded and reloaded at an intermediate port. When you book, ask whether the quoted transit is direct or transhipped, because a 28 day direct service and a 38 day transhipped one can carry the same headline rate.
Import clearance is where shipments sit, and almost always because of documentation rather than inspection. The declaration needs the commercial invoice with a correct tariff classification, the packing list, the bill of lading, and any certificates required for the product. Bags are generally uncomplicated to classify, but the classification determines the duty rate and getting it wrong means either overpaying or a post-clearance audit. Confirm the classification before you set reward prices, as covered in our tax and customs guide.
Drayage is the inland move from the port to the warehouse, and it is the leg most likely to be forgotten in the plan because it feels like a detail. It is not. Container free time at the terminal is limited, commonly 3 to 7 days, after which demurrage is charged per day. If the warehouse is not ready to receive, or the delivery appointment is not booked, the clock runs. Book the delivery appointment before the vessel arrives, and confirm the warehouse has a goods-in notification on file.
The planning figure for this whole stage is 7 to 14 days after the vessel berths, split roughly as 2 to 5 days for clearance and 2 to 7 days for drayage and delivery. Add contingency for the two events that reliably occur: a document query from customs, which adds one to three days, and a random physical inspection, which can add 3 to 10 days. Neither is unusual, and neither should be treated as a crisis, but both should be assumed in the schedule rather than hoped against.
| Stage | Typical duration | Proving document | Common delay |
|---|---|---|---|
| End of line packing and release | 3 to 7 days | Packing list, inspection report | Rework after a failed inspection lot |
| Inland haulage and export clearance | 3 to 7 days | Export declaration, booking note | Late vessel nomination by the buyer |
| Container loading and sailing | 1 to 4 days | Bill of lading | LCL consolidation cut-off missed |
| Ocean transit | 25 to 40 days | Bill of lading, tracking | Transhipment not disclosed at booking |
| Import clearance | 2 to 5 days | Commercial invoice, classification | Document query or random inspection |
| Drayage to warehouse | 2 to 7 days | Delivery appointment, goods-in notice | No appointment booked, demurrage accrues |
| Receiving and put-away | 3 to 7 days | Goods-in receipt with discrepancy note | No advance notification, labour unplanned |
| Pick, pack and label | 1 to 3 weeks | Pick list, packing specification | SKU count too high, instructions unclear |
| Last mile delivery | 3 to 15 days by zone | Manifest, tracking reference | Address errors, DDU refusals |
Receiving, count verification and put-away
Receiving is a twenty-minute operation if it was planned and a two-week problem if it was not. The planning item is the goods-in notification, sent to the warehouse before the container arrives, containing the purchase order reference, the SKU list, the carton count, the expected dimensions and weights, and the delivery window. With it, the warehouse books labour and space. Without it, the container sits on the dock and the demurrage clock that started at the terminal keeps running.
The count itself should follow the carton sequence rather than a bare total. If the cartons are marked *carton 12 of 84*, then receiving checks that numbers 1 to 84 are present, which immediately identifies any missing unit and produces a specific claim. If cartons are uncounted, the warehouse will check 84 cartons received against 84 expected and any internal shortfall will not surface until the last backer in the wave is waiting. The marking costs nothing at packing and prevents an entire class of dispute.
Inventory accuracy is the metric to ask your warehouse about, and the number to require is 99 percent or better. Below that, the practical consequence is oversell: the system believes there are 500 units, the shelf holds 492, and eight backers receive an apology instead of a bag. Ask how accuracy is measured, how often, and what the discrepancy reporting process looks like. A provider that cannot answer precisely does not measure it, and a provider that does not measure it will lose your stock and argue about the count.
Put-away is the last step and the one that determines how fast picking runs. The rule that helps most is to hold stock by SKU rather than by carton. Breaking sealed cartons into pickable locations at put-away makes the first wave faster, and it makes the wave plan more flexible, because each SKU can be released independently. It also makes the physical count easier to verify, because a pick face holds a known quantity in a known place rather than a mixed pallet.
.jpg)
Allocation logic: who gets the first wave
Allocation is the decision about who gets their bag first, and it is a communications decision disguised as a logistics one. The three workable rules are by pledge date, by reward tier and by destination zone. Each has a defensible logic and each has a constituency that will be unhappy if they are last. The important thing is to choose one, state it in an update before shipping starts, and then follow it, because an unstated rule reads as arbitrary and an arbitrary rule generates complaints from everyone.
By destination zone is usually the best operational choice, because it lets you start the longest transit lanes first so that the last parcel delivered in the furthest zone lands closer to the first parcel in the nearest zone. That compresses the perceived delivery window, which matters far more to backer satisfaction than the actual one. A campaign that delivers everything within 14 days is remembered as punctual; one that delivers across 10 weeks is remembered as slow, even when the last date was the one that was promised.
By pledge date is the most defensible on fairness grounds and is what backers intuitively expect, so it is the safest choice if you are going to state a rule at all. The operational cost is that it breaks zone consolidation, which means you lose the carriage efficiency of shipping all parcels to one country together and you lose the ability to start the slow lanes early. It works well when the destination mix is concentrated in one or two markets, and poorly when it is spread.
By reward tier makes sense when one tier is physically a different product that finishes later, for example a bundle that includes an add-on item with its own production window. It is a poor general rule, because it can leave early backers at a low tier waiting behind later backers at a high tier, which is exactly the kind of thing that gets screenshotted. If you have to use it, explain the physical reason in the update, because *the bundles contain a second item* is comprehensible and *tier order* is not.
Pick, pack, label and carrier handover
Picking is the operation most sensitive to SKU count, and SKU count is largely determined by decisions made months earlier. A campaign with two colourways and two add-on items has roughly 6 to 8 pickable SKUs. Add personalisation across five colourways and the count can pass 30. Every additional SKU multiplies the pick error rate and the training burden, which is a strong argument for constraining the reward structure at campaign design stage rather than at the warehouse.
Packing should be specified per SKU on one page with a photograph: what goes in the mailer, in what order, folded how, with what insert, and with what void fill. That page is the difference between a consistent unboxing and a box that varies by who packed it. Include the two details that prevent the most common complaints: wrap hardware so it cannot abrade the shell, and stuff the bag lightly with paper so it holds shape rather than arriving collapsed.
Labelling is where the address validation work pays off. The label should be printed from the normalised address, with the return address of the warehouse or a returns node rather than your home address, and with the tracking barcode generated at the point of labelling rather than attached afterwards. Where a customs declaration is required, it should be generated from the same data as the commercial invoice, so the declared value and classification are consistent across the batch.
The carrier handover produces the manifest and the tracking references, and the timing of that is a communication decision. Upload the tracking reference at dispatch, not on request. The reference appearing on the campaign page without prompting tells a backer that the parcel is real and moving; the same reference provided in response to a complaint tells them you had to be asked. It is the same information, and the difference in how it lands is the entire difference between a campaign that feels managed and one that feels improvised.
Last mile, exceptions and the return loop
Last mile runs roughly 3 to 15 days depending on zone and service level, and it is where the backer finally judges the campaign. Two things shape that judgement more than speed: whether tracking moved, and what happened when something went wrong. A parcel whose tracking updates daily and arrives in nine days generates no complaints. One whose tracking is static for six days and arrives in seven generates three messages.
The exceptions fall into four categories, and each has a standard response worth defining in advance. Delayed in transit: check the tracking, wait the carrier's stated investigation window, then re-ship if it is genuinely lost. Damaged in transit: request photographs of the carton and the product, lodge the carrier claim, and decide whether to replace before or after the claim resolves. Returned as undeliverable: correct the address and re-ship, charging or absorbing according to a published policy. Partial or wrong contents: verify against the pick list, then send the missing item rather than asking for the whole order back.
The return loop is the part most campaigns discover too late. A returned parcel comes back to a node, has to be identified, inspected, repacked and rebooked, and the cost is roughly double the original outbound, because you have paid carriage once and are paying it again plus handling. At a return rate of 2 to 5 percent across a mixed international campaign, on 1,000 parcels that is 20 to 50 units at double cost, which is a real line in the budget and a reason to hold safety stock.
The policy decision that prevents most of this is the one made at checkout: DDP rather than DDU. Under DDU the carrier bills the backer for duty and tax before releasing the parcel, and a meaningful number refuse it, which produces the most expensive kind of return. Under DDP those charges are collected at pledge time and remitted by you. The setup cost is real and the alternative is worse, as set out in our DDP shipping guide.
Building a buffer: safety stock and re-order triggers
Everything above assumes the run arrives complete and correct. It usually does, but *usually* is not a plan, and the buffer is what turns a problem into an inconvenience rather than a broken promise. Two buffers matter. The first is safety stock at the fulfilment warehouse, which absorbs damage claims, returned parcels and any shortfall found at receiving. The working figure is 1 to 3 percent of the run, which against a 500 pcs order is 5 to 15 units. That is a small holding against a large exposure, and the cost of not holding it is a replacement that has to come from a re-order.
The second buffer is overage on the production run itself. Ordering 2 to 5 percent above the confirmed backer count is standard practice, because it covers three things that are otherwise unfixable: units damaged during inspection handling, units held as retained reference samples, and the small percentage of backers whose reward tier changes after the survey closes. The economics are unusually favourable, because the marginal unit cost at the top of a run is lower than the average unit cost across it, so the overage is the cheapest stock you will buy.
The re-order trigger is the decision rule that tells you when to book a second run. Three signals matter. Stock coverage, meaning the number of weeks of remaining outbound demand at the current rate: below roughly 4 weeks of cover with a lead time of 35 to 50 days plus 5 to 9 weeks of transit, you are already late. Return and replacement rate, meaning whether the 1 to 3 percent safety stock is being consumed faster than expected. Late-pledge or store demand, which is real revenue and should be counted rather than treated as a bonus.
The arithmetic of the trigger is worth stating plainly, because it is the number creators most often get wrong. A re-order takes 35 to 50 days to produce, plus 3 to 7 days to pack and release, plus 25 to 40 days of ocean transit, plus 7 to 14 days of clearance and inland delivery. That is 10 to 16 weeks from booking to having stock on the shelf. If your current stock covers 6 weeks of demand and you book when it hits 4 weeks, there will be a gap of 4 to 10 weeks with nothing to ship. Book when coverage falls below the replenishment lead time, not when stock runs out.
Send us your destination mix and wave plan, and our programme coordinator will map the nine handovers against your dates and flag where the schedule is thin.
Key takeaways
- N
- i
- n
- e
- h
- a
- n
- d
- o
- v
- e
- r
- s
- ,
- n
- i
- n
- e
- d
- o
- c
- u
- m
- e
- n
- t
- s
- .
- M
- a
- p
- t
- h
- e
- m
- ,
- n
- a
- m
- e
- a
- n
- o
- w
- n
- e
- r
- f
- o
- r
- e
- a
- c
- h
- ,
- a
- n
- d
- b
- u
- i
- l
- d
- 8
- t
- o
- 1
- 2
- w
- e
- e
- k
- s
- f
- r
- o
- m
- i
- n
- s
- p
- e
- c
- t
- i
- o
- n
- r
- e
- l
- e
- a
- s
- e
- t
- o
- t
- h
- e
- l
- a
- s
- t
- p
- a
- r
- c
- e
- l
- .
Frequently Asked Questions
How long does it take to get bags from production to backers?
Plan 8 to 12 weeks from inspection release to the last parcel delivered. Bulk runs 35 to 50 days, packing and release 3 to 7 days, inland and export clearance 3 to 7 days, ocean transit 25 to 40 days, import clearance and drayage 7 to 14 days, receiving 3 to 7 days, and pick-pack plus last mile 1 to 3 weeks.
What does FOB Xiamen mean for a crowdfunding creator?
The seller gets the goods to the port of loading, export-cleared and loaded on board; risk transfers when the goods are on board. The buyer books the vessel and owns ocean freight, insurance and everything downstream. Nominate the carrier 2 to 3 weeks before release, because space on the main lanes is not always available at short notice. Send the document set to your forwarder before the vessel sails, so the import declaration can be prepared in advance.
What is AQL 2.5 and how many units get inspected?
It is an acceptance quality limit used with ISO 2859-1, defining sample size and accept or reject numbers. At 500 pcs and general inspection level II the sample size is 50 units, with an accept number of 3 and a reject number of 4 for minor defects. Critical defects are normally held at 0 and major at 2.5. The defect classification is what makes the result actionable, so agree the tier thresholds before the inspection is booked.
What happens if a production lot fails inspection?
The usual outcomes are release, release with rework, or hold. Rework is common on a soft product because most defects are stitching or finishing issues that can be corrected, and the affected units are re-inspected before shipping. Build 3 to 7 days of rework allowance into the schedule, because a lot needing rework with no allowance produces an unbudgeted delay.
Why should cartons be numbered sequentially?
Because it turns a count dispute into a simple question. With cartons marked carton 12 of 84, receiving checks that numbers 1 to 84 are present and immediately identifies any missing unit. With an uncounted total of 84, any internal shortfall only surfaces when the last backer in the wave is waiting. The marking costs nothing at packing and prevents an entire class of dispute at the receiving bay.
What inventory accuracy should I require from a warehouse?
99 percent or better, measured and reported. Below that the practical consequence is oversell, where the system believes there are 500 units and the shelf holds 492, so eight backers get an apology instead of a bag. Ask how accuracy is measured and how discrepancies are reported. Hold stock by SKU rather than by carton, so each wave can be released independently and counted easily.
Who should get their bag first?
Choose one rule, state it in an update before shipping starts and then follow it. Release by destination zone is usually the best operational choice, because starting the longest transit lanes first compresses the perceived delivery window. By pledge date is the most defensible on fairness grounds but breaks zone consolidation. Choose one rule, state it in an update before shipping starts, and then follow it without exceptions.
How much safety stock should I hold at the warehouse?
1 to 3 percent of the run. That covers damage claims, which typically run at 0.5 to 2 percent on a well-packed soft product, plus any shortfall identified at receiving, and it lets you send a replacement immediately rather than waiting on a re-order. Order 2 to 5 percent overage on the run as well, because the marginal unit at the top of a run is the cheapest stock you buy.
How much does a returned parcel cost?
Roughly double the original outbound, because you have paid carriage once and pay it again plus inbound handling, inspection and repacking. At a return rate of 2 to 5 percent on 1,000 parcels that is 20 to 50 units at double cost, which is why address validation and DDP matter. Address validation at survey stage and DDP at checkout are the two controls that reduce the return rate most.
How do I stop mildew on a sea freight shipment?
Confirm the goods are dry before packing, use polybags with ventilation holes rather than sealed ones where there is any residual moisture, and specify desiccant in the master carton. Condensation during a 25 to 40 day transit is the most common cause of a mould claim on a textile shipment. Carton-level desiccant costs cents and protects a product worth a hundred dollars across a 25 to 40 day transit.
What causes delays at import clearance?
Almost always documentation rather than inspection: an incorrect tariff classification, a commercial invoice inconsistent with the packing list, or a missing certificate. Confirm the classification before you set reward prices, and send the full document set to your forwarder before the vessel sails. Confirm the classification before you set reward prices, not after the goods have shipped and the duty is assessed.
What is demurrage and how do I avoid it?
It is the charge for leaving a container at the terminal beyond the free time, commonly 3 to 7 days. Avoid it by booking the delivery appointment before the vessel arrives and confirming the warehouse has a goods-in notification on file, so the container moves straight off the port. Send the goods-in notification before the container arrives so the warehouse has booked labour and space.
People Also Ask
What does FOB Xiamen mean?
The seller clears export and loads the goods on board; risk transfers there. The buyer books the vessel and pays ocean freight and everything downstream.
How long is ocean transit?
About 25 to 40 days port to port on the main east-west lanes. Ask whether the quoted service is direct or transhipped, because transhipment adds 5 to 14 days.
How many units are inspected at 500 pcs?
About 50 at general inspection level II under AQL 2.5, with an accept number of 3 and a reject number of 4 for minor defects.
What is a goods-in notification?
The document sent to the warehouse before the container arrives, listing the SKUs, carton count, dimensions, weights and delivery window.
Why are my cartons numbered?
So receiving can check that every number in the sequence is present, which turns a count dispute into a simple question about which number is missing.
What is demurrage?
A daily charge for leaving a container at the terminal beyond the free time, usually 3 to 7 days. Book the delivery appointment before the vessel arrives.
Should I use DDP or DDU?
DDP. Under DDU the backer is billed duty on delivery and a meaningful number refuse the parcel, which is the most expensive kind of return.
How much safety stock is enough?
1 to 3 percent of the run, covering damage claims and any receiving shortfall so replacements can ship immediately.