Custom Bags for Kickstarterby QUANZHOU JUNYUAN BAGS Get a quote

Kickstarter Sports Bag MOQ: What a Small Campaign Can Order

A small sports campaign can realistically order 500 pcs of one style in one colourway, and that is the number to plan around. The minimum is 500 pcs per style and per colourway, which means two colourways is two commitments and two styles is two commitments. At an average of 1.2 units per backer, 500 pcs needs roughly 400 to 420 backers on the bag tier, or a mix of individual pledges and one or two group orders. Sampling runs 6-10 working days and production 35-50 days, so the real constraint for a small campaign is rarely the minimum itself; it is committing to the right single configuration early enough to hold a production slot.

A weekender bag from the pilot run — Kickstarter Sports Bag MOQ
A weekender bag from the pilot run: the point where a written spec becomes a physical sample.

Minimum order quantity is the number that stops more small campaigns than price does. It is also the number most often misunderstood, because creators read 500 pcs as a total and it is not a total: it is 500 pcs per style and per colourway. This article sets out what that distinction costs, how to convert pledges into units before you commit, which stretch goals quietly break the plan, and what a realistic ordering structure looks like when you are expecting a few hundred backers rather than a few thousand.

Minimum order quantity
500 pcs per style / colourway
Sampling
6-10 working days (12-15 for complex builds)
Bulk production
35-50 days after deposit + approved pre-production sample
Inspection
AQL 2.5 to ISO 2859-1
Trade term
FOB Xiamen
Payment
T/T 30/70
Production floor
4,950 m2 SGS-verified, 137 staff, 7 lines, 149 machines
Monthly capacity
200,000 pcs per month
Campaign experience
20+ crowdfunding campaigns supported

Key takeaways on small-campaign minimums

  • 500 pcs is per style and per colourway, not per order; two colourways means 1,000 pcs.
  • At 1.2 units per backer, 500 pcs needs roughly 400 to 420 backers on the bag tier.
  • Set-up and line changeover are why minimums exist; they are a fixed cost, not a negotiating position.
  • Colourway should be a decoration decision on a first campaign, not a fabric decision.
  • Ask about a split within one production run in the RFQ; it costs one line of text to find out.

What 500 pcs per style and colourway actually means

Read the minimum as two independent constraints that stack. The style constraint means a backpack and a duffel are two styles and therefore two minimums. The colourway constraint means a black version and a grey version of the same backpack are two colourways and therefore two minimums. A campaign offering two styles in two colourways is committing to four minimums, which is 2,000 pcs, and that is before any consideration of whether the audience actually wants four configurations.

The practical reading for a small campaign is therefore simple: pick one style and one colourway for the first production run. That is a single commitment of 500 pcs. Everything else the campaign wants to offer, including additional colours and sizes, should be delivered through decoration, through accessories or through a later re-order rather than through a second production configuration. This is not a compromise on ambition; it is the structure that lets a campaign with 400 backers exist at all.

There is one important nuance. A split within a single production run, where two colourways share materials and are sewn in the same window, is sometimes feasible. It depends on the fabric, the trim set and the line schedule, and it has to be negotiated at quotation stage rather than assumed. The cost of asking is one line in a request for quotation. The benefit, when the answer is yes, is variant demand data for the price of one minimum instead of two. Our low minimum bag production page covers the structures that make this possible.

Translating pledges into units: the conversion maths

Creators plan in backers and factories plan in units, and the gap between the two is where minimums surprise people. The conversion depends on your tier structure. A campaign where every backer receives one bag converts at close to 1.0 units per backer. A campaign with a multi-unit tier, a team tier or a gift tier converts higher, and in sports niches a figure of 1.2 to 1.5 units per backer is common once group orders are included.

Work it backwards from the minimum. At 1.0 units per backer, 500 pcs needs 500 backers on the bag tier. At 1.2 it needs about 417. At 1.5 it needs about 334. If your realistic backer estimate is 300, then a single 500 pcs run only works if you either raise the average units per backer through a group or family tier, or accept a smaller first run through a negotiated structure. Both are legitimate; neither happens by accident.

Add a reserve for the things the maths forgets. Damaged units, units held back for warranty replacement, units sent to reviewers and press, and units used for photography all come out of the same run. A working reserve of 3 to 5 per cent is normal. On a 500 pcs run that is 15 to 25 units, which is worth stating explicitly in the plan so that the reward count and the production count are never confused with each other.

Backers required to clear a 500 pcs minimum at different units-per-backer ratios
Units per backerBackers needed for 500 pcsCampaign profile
1.0500Single-unit tiers only
1.1455Mostly single, some two-unit gifts
1.2417Family tier present
1.3385Family plus small group orders
1.5334Strong team or club tier
2.0250Group-led campaign
  • Convert backers to units before you quote, using your own tier structure rather than a rule of thumb.
  • Include a 3-5 per cent reserve for warranty, press and photography units.
  • Count group orders separately; they move the ratio more than any marketing activity.
  • Recalculate after any tier change; a new two-unit tier changes the whole plan.
  • Keep the production count and the reward count as two separate numbers in your plan.

Why minimums exist: set-up, cutting and line changeover

A minimum is not a negotiating position; it is a fixed cost expressed as a quantity. Every production run carries set-up work that is the same whether the run is 200 pcs or 5,000 pcs. Patterns are made or loaded, markers are planned, cutting tables are laid, machines are threaded with the correct thread and tension, staff are briefed on the sequence, and a sample is produced on the line and checked before the run proceeds. None of that scales down.

Cutting is the clearest example. Fabric is cut in lays, and the labour of spreading a lay, pinning a marker and moving the stack does not fall proportionally with quantity. Below a certain run length the cutting set-up dominates the unit cost to the point where the price per piece stops making sense for either side. Trims behave the same way: zip tape, webbing, elastic and labels are bought in minimum lengths from upstream, and a short run leaves dead stock that has to be paid for somewhere.

Line changeover is the third element and the one most relevant to a campaign creator. A sewing line is scheduled in blocks, and changing a line from one product to another costs time across the whole sequence. A short run occupies the same changeover slot as a long one. Understanding this changes the conversation: asking for a lower minimum is asking someone to absorb a fixed cost, while asking for a split within an existing run is asking them to use an existing slot differently. The second question gets better answers. See bag manufacturing for campaign creators for how slots are scheduled.

A drawstring bag from the pilot run — Kickstarter Sports Bag MOQ
Same drawstring bag, two production decisions — this is the one the section argues for.

When 500 pcs is genuinely too many

Sometimes the honest answer is that a campaign is too small for a custom run, and recognising that early is cheaper than discovering it after the campaign closes. The signals are consistent: fewer than 250 likely backers on the bag tier, no group or team demand in the audience, a reward price that leaves less than 30 per cent gross margin after unit cost and shipping, and a niche where the audience is spread across many countries with no concentration.

There are three constructive responses. The first is to change the product rather than the quantity: a simpler construction with fewer panels, fewer hardware items and a single decoration position costs less per unit and is achievable at a lower reward price, which raises conversion and makes the minimum reachable. The second is to change the offer: a bundle or a two-unit tier raises units per backer. The third is to change the timing: run a pre-launch demand test, then produce.

The response that does not work is to promise a reward you have not costed and then try to source it after funding closes. That path ends in either a much higher unit price than the campaign assumed, because a rush order with no reserved slot costs more, or in a delay measured in months. Our team has supported 20+ crowdfunding campaigns and the pattern is consistent: the campaigns that quote before they launch are the ones that deliver on the promised month.

It is also worth separating two problems that get treated as one. A campaign can be too small for a custom run and still be viable as a business, because the remedy may be a smaller first run at a higher unit cost rather than no run at all. Equally, a campaign can be large enough and still fail on timing, because the audience is seasonal and the window has passed. Diagnose which problem you have before choosing a remedy, since ordering more units does not fix a timing problem and ordering fewer does not fix a demand problem.

Colourway and variant strategy inside one minimum

Colour is the most common way a small campaign accidentally doubles its commitment. A campaign page showing three colourways with a backer survey at the end looks generous and costs 1,500 pcs if all three are produced as separate colourways. The alternative that preserves the choice without tripling the commitment is to make colour a decoration decision: one base fabric colourway, with panels, webbing, lining, zips and prints used to create visual variants.

Trim-led variation is more powerful than it sounds. A black shell with different zip tape, webbing and lining colours reads as three distinct products in photography, particularly when the lining is visible in an open-bag shot. Print and label variation extends it further. What it does not change is the base fabric, which is the item that carries the minimum, the dye lot risk and the lead time. That is exactly what a small campaign should be protecting.

If the audience genuinely demands distinct shell colours, sequence them. Produce the hero colourway first at 500 pcs, and use the pledge data to justify the second. Reserve the second slot before the campaign closes rather than after, because a slot reserved after funding has to join the back of a queue that is already 35-50 days long. Our custom team sports bags article shows the same logic applied where several clubs each want their own colour.

Variant strategies compared against the 500 pcs per colourway minimum
StrategyTotal commitmentVisual varietyRisk
Single colourway, trim variation500 pcsModerate; reads as 2-3 productsLowest
Single colourway, lining variation500 pcsModerate; visible in open shotsLow
Split within one run, if agreed500 pcs totalHighDepends on material and schedule
Two colourways, sequenced500 + 500HighTiming risk on the second slot
Three colourways in parallel1,500 pcsHighestInventory concentration

Accessories are the better place to spend a second minimum if you have one. A matching pouch, a shoe bag or a wet kit sack can be produced as a separate smaller item, often at a lower minimum than a full bag, and it adds perceived value to a tier without adding a second pattern, a second sample round or a second set of photography. That is a cheaper route to a two-product campaign than producing two bags, and it is the structure several of the campaigns we have supported have used.

Style versus variant: when two designs double the commitment

A style is a different product, not a different colour. A backpack and a duffel, a 30-litre and a 45-litre version, a men's and a women's cut: each of these is a separate style with its own pattern, its own marker, its own sample and its own minimum. Two styles means two minimums, two sampling rounds and two sets of set-up cost, and on a small campaign it usually means neither gets produced well because attention and budget are split.

The exception worth considering is a size ladder within one style where the pattern is graded rather than redrawn. Grading a pattern up or down is cheaper than creating a second pattern, and it may be treated as a variant rather than a new style. That has to be confirmed at quotation stage, because the answer depends on how much of the construction changes. Ask it as a specific question with the two sizes stated, not as a general enquiry about flexibility.

For a first sports campaign, the recommendation is one style at one size. Sports bags are more forgiving of size than apparel, because a bag does not have to fit a body. A single well-specified 35 to 40 litre sports bag serves the overwhelming majority of use cases, and the engineering effort saved goes into the compartments and hardware that backers actually notice. Spend the second minimum, if there is one, on a re-order rather than on a second style.

There is one more trap in the style conversation, and it is the accessory that is quietly treated as a second product. A matching pouch, a strap pad or a wet kit sack each carry their own minimum and their own sample, and a campaign that adds three of them has effectively taken on three extra styles without calling them that. Bundle them into the main specification instead, quote them in the same request, and confirm which of them can share a production run with the bag. Asking that question costs one line and often saves a full minimum.

Stretch goals that break the MOQ plan

Stretch goals are sold as additions and they often function as multiplications. A stretch goal that unlocks a second colourway adds a minimum. A stretch goal that adds a matching pouch adds a second product with its own minimum and its own sample. A stretch goal that upgrades the material changes the fabric specification after the price was set, which means the unit cost has to be re-quoted at the very moment the campaign has least time to absorb it.

The safe stretch goals are the ones that do not touch the bill of materials. Extra colourways of a printed insert, an additional strap pad, a branded keyring sourced separately, a digital reward, a second decoration position, or a packaging upgrade are all achievable without re-quoting the bag. They also tend to be cheap, which means they can be offered at lower funding thresholds and used to keep momentum in the middle of a campaign.

Where a stretch goal does change the product, price it before launch rather than during the campaign. Ask for the alternative specification to be quoted alongside the base specification in the original request, so that unlocking a stretch goal is a confirmation rather than a new negotiation. Campaigns we have supported that pre-quoted their stretch goals avoided the worst outcome in this category: a funded upgrade that arrives three months late because it was only costed after the campaign closed.

  • Avoid stretch goals that add a colourway, a size or a second product.
  • Prefer stretch goals that add decoration, packaging or a separately sourced accessory.
  • Pre-quote any stretch goal that changes the bill of materials before launch.
  • State in the campaign page what each stretch goal does to the delivery month.
  • Remember that every new configuration needs its own sample and its own approval gate.

Unit cost at 500, 1,000 and 2,000 pcs

Unit cost falls with quantity, but not evenly, and understanding which costs fall and which do not is more useful than a single number. Material cost falls slightly through better purchasing and less waste. Labour falls modestly through line efficiency once operators are past the learning curve. Set-up, sampling and pattern costs are fixed and therefore fall sharply per unit as quantity rises. Decoration set-up behaves the same way.

The practical shape for a mid-specification sports bag is that moving from 500 to 1,000 pcs typically reduces unit cost by a low double-digit percentage, and moving from 1,000 to 2,000 pcs produces a further but smaller reduction. Treat that as a directional range rather than a promise, because the actual figure depends on panel count, hardware specification and decoration complexity. A simple drawstring moves more than a structured backpack with a moulded back panel.

The decision that matters more than the unit cost is whether to order 500 or 1,000 at all. Ordering 1,000 when 600 will sell ties up cash and warehouse space, and unsold stock is the most common reason a first campaign does not lead to a second. Ordering 500 and re-ordering at a slightly higher unit cost is usually the better structure, provided the re-order is planned in the original request and the material is repeatable. Our custom sports bags for Kickstarter pillar page sets out the full cost framework.

Indicative cost behaviour for a mid-specification sports bag at three quantities, FOB Xiamen
Cost line500 pcs1,000 pcs2,000 pcs
Materials and trimsBaseline1-4% lower3-7% lower
Cutting and sewing labourBaseline3-8% lower6-12% lower
DecorationSet-up amortised over 500Set-up halved per unitSet-up quartered per unit
Sampling and patternHighest per-unit shareHalfQuarter
Packing and cartonsBaselineSlightly lowerLower
Indicative total movementBaselineLow double-digit reductionFurther smaller reduction
500 pcsMOQ per style / colourway
1.2Typical units per backer, sports niche
~417Backers needed at 1.2 units each
3-5%Reserve for warranty and press units
35-50 daysBulk production window
6-10 daysSampling, standard build

How minimums interact with the production calendar

Quantity and timing are linked through the line schedule. A production slot is a block of time on a line, and a 500 pcs run and a 2,000 pcs run occupy different lengths of the same queue. That means the minimum you choose changes when you can start, and it means a slot booked late joins a queue that is already full. With production 35-50 days and 200,000 pcs per month of capacity across 7 lines, slot availability is generally workable, but it is not unlimited in any given month.

The interaction that catches small campaigns is the re-order. A campaign that sells out 500 pcs and wants another 300 has two problems: the second run is below the minimum, and it joins the queue at the point of request rather than at the point of the original booking. The fix is to reserve a second slot in the original agreement, with a defined confirmation date, and to ask whether a re-order below the minimum is possible at a stated premium. Both questions cost one line each in a request for quotation.

Seasonality is the third factor. Sports demand clusters: indoor seasons, marathon calendars, back-to-school and holiday gifting all create peaks. A run that starts in a peak month competes for capacity with everything else in the category. Where the delivery date allows, starting a run outside the peak is a small scheduling advantage that costs nothing. See crowdfunding rewards fulfilment for how production timing meets the shipping calendar.

Forecasting demand before you commit

The purpose of forecasting is not accuracy; it is deciding which single configuration to commit to. Three inputs are enough. First, a pre-launch waitlist or email list with a stated conversion range: small lists convert at 5 to 15 per cent to a paid pledge depending on how warm they are. Second, comparable campaign data from the same niche, which is directional but useful for tier mix. Third, a survey of the waitlist on colourway and configuration preference, which is the input that actually decides the commitment.

Run the survey with a forced choice rather than a preference ranking. Asking people to pick one colourway from three produces a decision; asking them to rank three produces a tie and no decision. Ask about configuration as well: one style at one colour, or two colourways at a higher funding threshold. The answer is usually that people want choice and will accept a single colour if the alternative is a later delivery, which is a trade-off worth stating explicitly in the question.

Then plan the funding target around the minimum rather than the reverse. If 500 pcs is the commitment, the funding target should cover 500 pcs of production plus sampling plus freight plus a contingency, and the campaign should be structured so that hitting roughly 60 to 70 per cent of the target still leaves the run viable. That usually means the bag tier has to be priced with enough margin to survive a smaller-than-expected take-up, which is a pricing decision rather than a sourcing one.

  1. Build a pre-launch list and measure it; assume 5-15 per cent conversion to a paid pledge.
  2. Survey the list with a forced choice on colourway and on single versus multi configuration.
  3. Convert expected backers to units using your tier structure and a 1.0-1.5 units per backer range.
  4. Add a 3-5 per cent reserve for warranty, press and photography.
  5. Choose one style and one colourway that covers the largest share of survey responses.
  6. Set the funding target to cover 500 pcs plus sampling, freight and contingency.
  7. Reserve a second slot in the original request with a defined confirmation date.

One last discipline: write the plan down and publish the parts backers care about. A campaign page that states the configuration, the delivery month, the data cut-off and the re-order policy reads as a professionally run programme, which raises conversion independently of the product. The same document then becomes the brief you send for quotation, which means the marketing promise and the production request are the same text rather than two versions that drift apart.

An ordering plan a small campaign can execute

A workable plan for a first sports campaign looks like this. One style, one colourway, 500 pcs. Trim-led variation for visual choice. A single decoration position plus an optional personalisation add-on executed by heat transfer so it does not change the production sequence. One reward tier at one bag, plus a two-unit family tier to lift units per backer. A stretch goal ladder built from packaging and accessory additions rather than new configurations.

The sampling plan runs in parallel with the pre-launch period rather than after the campaign. Two rounds at 6-10 working days each, or 12-15 for a complex build, fit comfortably into a six to eight week pre-launch window and remove four to six weeks from the post-campaign path. Approve the pre-production sample in writing before launch where possible, so that the only thing standing between funding and production is the deposit.

The final element is the reserve decision. If the campaign over-performs and sells 700 units against a 500 pcs run, the options are a re-order, which needs its own window, or a smaller second run at a premium. Both are better than over-committing before launch. Campaigns we have supported have generally found that under-ordering by 100 units and re-ordering costs less than over-ordering by 300 and holding stock for a year.

A custom bag from the pilot run — Kickstarter Sports Bag MOQ
A custom bag photographed on the bench, with the seams and hardware this section discusses.

Finally, decide what happens if the campaign underperforms, before it launches. If 500 pcs is the commitment and only 300 backers arrive, the options are to proceed with the run and hold stock, to reduce the run at a premium, or to refund. Knowing which of those you would choose, and what each costs, is the difference between a decision made calmly and one made in the week after a disappointing close. Write it down and keep the numbers with the campaign plan.

MOQ questions to put in the RFQ

A request for quotation is the cheapest place to ask every question in this article. Write them as specific questions with the numbers attached, because a general enquiry about flexibility produces a general answer. Ask about a split within one run, about a graded size ladder, about a re-order below the minimum, about a reserved second slot and about which elements of the specification carry the minimum and which do not.

  • Is the minimum 500 pcs per style and per colourway, and does a graded size count as a variant?
  • Can two colourways be split within a single production run, and at what ratio?
  • What is the unit price at 500, 1,000 and 2,000 pcs for this exact specification?
  • Can a re-order below 500 pcs be produced, and at what premium?
  • Can a second production slot be reserved now with a confirmation date?
  • Which specification elements drive the minimum: fabric, trims, hardware or decoration?
  • Does sampling of 6-10 working days change if the build is rated complex at 12-15 days?
  • Is the 35-50 day bulk window measured from deposit, from approved sample, or from both?

Send the request as one document with the specification attached and you will receive a unit cost, a sampling estimate, a production window and answers to the minimum questions in a single exchange. That is the point at which a small campaign stops guessing. Our team works as a campaign bag specialist for creators at exactly this stage, and the crowdfunding bag guide walks through the path from there to delivery. When you have a specification, send us a brief through the quote request page and we will come back with numbers you can build a campaign on.

Frequently Asked Questions

What is the MOQ for custom sports bags on a Kickstarter campaign?

The minimum is 500 pcs per style and per colourway. It is not 500 pcs per order. One backpack in one colourway is a single 500 pcs commitment. Two colourways of the same bag is 1,000 pcs, and two styles in two colourways is 2,000 pcs. A split within a single production run is sometimes possible where colourways share materials, but it must be negotiated at quotation stage.

How many backers do I need to justify a 500 pcs run?

It depends on units per backer. At 1.0 units per backer you need 500 backers on the bag tier. At 1.2 you need about 417, and at 1.5 about 334. Sports campaigns with a family or team tier commonly run at 1.2 to 1.5. Add a 3 to 5 per cent reserve on top of the 500 pcs for warranty, press and photography units.

Can I order fewer than 500 pcs for a small campaign?

Sometimes, at a premium, and usually only as a re-order against an existing specification. The minimum reflects fixed set-up: pattern loading, marker planning, cutting lays, machine set-up and line changeover all cost the same whether the run is 200 or 5,000 pcs. Ask the question with your quantity stated and expect the unit price to move rather than the minimum to disappear.

Can two colourways share one production run?

Occasionally, where the colourways share the same materials and trims and are sewn in the same window. It depends on the fabric, the trim set and the line schedule, so it has to be confirmed at quotation stage rather than assumed. The cost of asking is one line in a request for quotation and the benefit, when the answer is yes, is variant demand data for one minimum.

Do two sizes count as two styles?

Usually yes, because a different size needs a different pattern and marker. The exception is a graded size ladder where the pattern is scaled rather than redrawn, which may be treated as a variant. Ask the specific question with both sizes stated. For a first campaign, one size is normally the better answer, because a bag does not have to fit a body.

How much does unit cost drop between 500 and 1,000 pcs?

Typically a low double-digit percentage for a mid-specification sports bag, with a further but smaller reduction between 1,000 and 2,000 pcs. The fall comes mostly from fixed costs: sampling, pattern and decoration set-up are amortised across more units. Materials move 1-4 per cent and labour 3-8 per cent. Simple constructions move more than structured ones.

Should I order 1,000 pcs to get a better unit price?

Usually not on a first campaign. Ordering 1,000 when 600 will sell ties up cash and warehouse space, and unsold stock is the most common reason a first campaign does not lead to a second. Order 500, plan the re-order in the original request, and confirm the material is repeatable so the second run matches the first.

Which stretch goals are safe for a bag campaign?

Stretch goals that do not change the bill of materials: packaging upgrades, an extra printed insert, a separately sourced accessory, a second decoration position or a digital reward. Avoid stretch goals that add a colourway, a size or a second product, because each carries a new minimum and a new sample. Pre-quote anything that changes the specification.

How does the minimum affect my delivery date?

Quantity determines how long a run occupies a line, and a slot booked late joins a queue that is already full. production 35-50 days after deposit and written sample approval, and sampling is 6-10 working days per round. Reserving a slot before the campaign closes is the single most effective step a small campaign can take to protect its delivery month.

What happens if my campaign sells more than 500 units?

You re-order. The second run needs its own production window, so reserve a slot in the original agreement with a defined confirmation date, and ask whether a re-order below the minimum is possible at a stated premium. Under-ordering by 100 units and re-ordering usually costs less than over-ordering by 300 and holding stock for a year.

How should I survey my audience on colourway?

Use a forced choice rather than a ranking. Asking people to pick one colourway from three produces a decision; asking them to rank three produces a tie. Also ask about configuration: one colourway delivered on time, or two colourways delivered later. The answer is usually that people will accept a single colour if the alternative is a delay.

Can sampling happen before the campaign launches?

Yes, and it should. Two rounds at 6-10 working days each, or 12-15 for a complex build, fit into a six to eight week pre-launch window and remove four to six weeks from the post-campaign path. Approving the pre-production sample before launch means the only thing between funding and production is the deposit under T/T 30/70.

People Also Ask

What does 500 pcs per style and colourway mean?

It means each style and each colourway carries its own 500 pcs minimum. One bag in one colour is 500 pcs. Two colours of the same bag is 1,000 pcs.

Can a small campaign order less than 500 bags?

Rarely as a first order. The minimum reflects fixed set-up costs that do not scale down. A re-order below the minimum is sometimes possible at a premium.

How many backers equal 500 units?

About 500 at one unit each, about 417 at 1.2 units each and about 334 at 1.5. Group and family tiers lift the ratio.

Is it cheaper to order 1,000 instead of 500?

Per unit, yes by a low double-digit percentage. In total cash and risk, usually no for a first campaign, because unsold stock is expensive.

Do two colourways double my minimum?

Yes, unless a split within a single production run is agreed at quotation stage. Ask the question in the RFQ; it costs one line.

Why do bag minimums exist at all?

Because set-up is fixed. Pattern loading, marker planning, cutting lays, machine threading and line changeover cost the same at 200 pcs as at 5,000 pcs.

What is the safest stretch goal for a bag campaign?

One that does not change the bill of materials: packaging, an accessory, a print insert or a second decoration position. Avoid new colourways and new products.

Should I reserve a production slot before launch?

Yes. A slot booked after funding joins a queue that is already 35-50 days long. Reserving before launch is the cheapest way to protect a delivery month.